amethyst muse

|

22 March 2003

last night i finished sweet; at least the knitting portion. right now (in between surfing the ring) i'm pinning it down and blocking it. oddly enough the pattern specifies to steam press it on the wrong side to block. so i pressed it to eliminate the curling, then misted it with water and pinned it down to my makeshift blocking carpet remnant. if i sew it up tomorrow, i may just get a week or two of wear before it's put away til fall. babygirl's sweater is coming along. i'm not quite sure if i will have enough, but if anything, i will do a crew neck instead of a turtleneck. it is knitting up pretty quickly, considering that i'm using #5 needles.

0 Comments:

Post a Comment

<< Home